The area between the two wings that will become the new courtyard. The original state of what was to become the courtyard.

The area between the two wings. The original connecting block at the tower end has been demolished. Foundations are being prepared for the two new connecting blocks. The area in the view will become the courtyard. 23rd July 2001.

The original state of what was to become the courtyard. The main wing is on the left and the 'bedroom' wing is on the right. The original enclosed corridor is directly in front. 5th August 2000.

 A brief history of Ael y Bryn  Our bed and breakfast establishment here in Pembrokeshire is graded 5 stars by Visit Wales.Winner of the Wales Gold Award for 2010.

Iaith Cymraeg English Language
Home page
The bedrooms
Breakfast & dinner
Prices for bed, breakfast & dinner
How to find us
What guests appreciate
Activities in Pembrokeshire
Access statement
Gallery
Environmental policy
History of Ael y Bryn
Enquiries



stay@aelybrynpembrokeshire.co.uk

Ael y Bryn

Eglwyswrw

Crymych

Pembrokeshire

West Wales

SA41 3UL

UK


Phone:

+44 (0)1239 891411




Website links



An early photograph of Ael y Bryn taken from Frochest.

An early photograph of Ael y Bryn taken from Frochest. The precise date is unknown, but we speculate that it was taken in the 1950s.


The conservatory under construction.

The conservatory under construction. The crane is lifting one of the two A-frames into position. Two A-frames support the conservatory roof. 24th April 2002


A general view of  work in progress.

A general view of work in progress. The original roof on the main wing has been removed. 30th July 2001.


The water tower before construction started.

The water tower in its original state before construction started. 23rd July 2000.


The kitchen area and the water tower; the original roof has been completely removed. 29th July 2001.


The original latrine and washing area under the water tower.

The original latrine and washing area under the water tower. This area is destined to be the kitchen. 16th July 2001.


The roof timbers and A-frames over the main wing.

The roof timbers and A-frames over the main wing; the partitioning walls dividing the wing into the dining room, music room etc have not yet been constructed. 9th Nov 2001.


The building that is today known as Ael y Bryn is of local historic interest in the village of Eglwyswrw and has an interesting story to tell.

In 1942 the Government Ministry of Works Department requisitioned 2˝ acres from Frochest Farm to build a Hostel for agricultural workers. For most of the war, the agricultural workers were prisoners of war captured during the Italian campaign. A national building contractor called Higgs and Hill built the accommodation using Goodwick, Emlyn and Trimsaran bricks.

One of Higgs and Hill's most recognised architectural buildings is the Hoover Building in Perivale West London, built in 1932 in the Art Deco style.

The building in Eglwyswrw was designed with two wings in the East and West. Each wing was 30 to 40 metres in length and 6 metres wide. The East wing housed the offices and accommodation of the person in charge and the West wing housed the sleeping quarters. The building was divided into bays with 8 bunk beds in each bay. The showers and sanitary accommodation were located under the tower. A narrow corridor joined the two buildings.

Later a third asbestos prefabricated building was added and used for recreational purposes. This has now been demolished.

At first the water supply was obtained from Frochest, but the supply soon proved vastly inadequate for the forty or so persons on site. The water was then obtained from the village from a well called Ffynnon Fair (Mary’s well). The well is still in existence on Tyddyn Castell land. The water was pumped daily and stored in tanks in the water tower. The Hostel had its own sewage treatment works. The water tower and the large circular filter bed are now disused but remain as features of the present building.

The Hostel was first occupied by the Women’s Land Army – women who had chosen to work on the farms rather than join the fighting services. There was a matron in charge and the women were taken out daily to different farms. Unlike those who were to follow, their movements were not restricted and were often seen in the evening service in Church.

When they moved to Croesgoch near St. Davids they were replaced by Irish workers who did the same work.

The next to arrive were Italian Prisoners of War who had surrendered during the North African campaign. Their movements were restricted and they were taken in lorries to farms in the mornings and returned to the camp in the evenings. There was a Sergeant and three or four Privates always in charge and on duty.

Although the prisoners wore tunics similar to the British Army, the prisoners’ tunics were brown with a yellow circle on the back and front so they could be easily recognised should anything untoward happen.

Next came the German Prisoners of War to whom the same restrictions applied.

At the end of the War the prisoners left; they were followed by Polish ex-servicemen who had fought against Hitler and were in danger of their lives if they returned to Poland.

In 1952 the Government returned ownership of the Hostel to Frochest Farm; the buildings were used for general agricultural use and the keeping of livestock during the winter.

Two Army ex servicemen have since been contacted. They were brought to the UK following the surrender of the Italian Army in North Africa.

They were angry young men fighting a war not of their making, and away from their families but they remember the kindness of the Welsh people while working on their farms.

We discovered the buildings in the year 2000, and by then they were in a poor state of repair. We purchased the buildings and started on the planning and development process to make them into the family home you see today. The two wings were retained and two new link buildings for the entrance hall and library were constructed to form the inner courtyard. The courtyard retains the style of the original narrow windows that were a feature in the original design. The walls were constructed of a cavity clay brick and an outer brick from the local Goodwick brickworks. This construction was retained and an additional insulated inner wall was added. Old bricks have been recycled around the garden to form paths and to build the cascading ponds.

On the left you can see some example photographs of the house before and during reconstruction. Click on the photographs for a larger view.